Traditional House Build Timeline

Month 1
Close on a lot

Start contractor search

Month 2
Start Planning

Find architect and start design

Month 3
Find a contractor

Share plans with contractor

Month 4
Site Layout

Finalize Plans and pull permits

Month 5
Break Ground
Month 6
Framing
Month 7

Drywall is complete and begin finishes

RivaHaus Build Timeline

Month 1
Close on a lot

Order a house from our website

Month 2
Site Layout
Month 3
Break Ground and Frame
Month 4
Finalize Mechanicals
Month 5
Finalize Drywall
Month 6
Finalize Finishes

Plan Housewarming Party

Month 7

Sit on the patio

Month 8

Host tailgate party

Month 9

Plan Halloween Costumes

Month 10

Turn on your heated
floors

Month 11

Sit by the fire and wrap presentsfloors

Design considerations

  • Radiant prefabricated floors
  • Structurally Insulated Panels
  • Energy Star rated windows
  • Energy Start rated heating and cooling

Green Building Standards

  • Prefabricated Panels
  • Reduced labor
  • Standard sizes: reduce waste & complexity